Description

The project was for 1,000 m2 of new retail space in Terminal 4 under extremely challenging conditions. The program only allowed us 3 months of construction in an operational airport with multiple stakeholders. The design and details were sophisticated with heavy steel structures that had to be detailed in such a way as to be handled manually. Complicated electrical works also added to the challenge.